neocentengineering

Details Mechanical Calculation & Detail CAD Modelling for Gland Steam Condenser Skid Package

Project Info

Detail Design calculation , Piping Stress Analysis and Detail fabrication Drawing for Condenser-vaccum unit Inter connecting Piping

Client

Leading Manufacturer of Vacuum Skid package

Category

Oil and Gas

Project Duration

24 Week

Location

United Kingdom

Description

Client:

A Europe-based client offering an array of customized solutions to the chemical, pharmaceutical, petrochemical, oil refinery, power generation, and waste treatment.

Engineering Requirement:

Our client sought engineering design assistance for equipment’s (ASME U-stamp) design and interconnecting piping routing. The client wanted Stress simulation on Equipment for the TUV Nord certification approval process along with piping stress analysis.

Neocent Solution and Deliverables: