Project Info
Detail Design calculation , FEA Stress Analysis and Detail fabrication Drawing for Gland Steam Condenser Skid package
Client
Leading Manufacturer of Vacuum Skid package
Project Duration
18 Week
Category
Oil and Gas
Location
United Kingdom
Description
Client:
A UK-based client offering an array of customized solutions to the chemical, pharmaceutical, petrochemical, oil refinery, power generation, and waste treatment.
Engineering Requirement:
Our client was seeking engineering design assistance for equipment (ASME U-stamp)design along with interconnecting piping routing. The client wanted a Stress simulation on Skid Structure with IBC-2015 with ASCE 7-10.(LRFD load Combination).