Project Info
Detail Design calculation , Piping Stress Analysis and Detail fabrication Drawing for Mud Gas Separator Skid Package
Client
Leading Manufacturer of Offshore Equipments
Project Duration
14 Week
Category
Offshore Rigging Plants
Location
United Kingdom
Description
Client:
A UK-based client offering an array of customized solutions to the chemical, pharmaceutical, petrochemical, oil refinery, power generation, and waste treatment.
Engineering Requirement:
Our client was seeking engineering design assistance for a Separator (ASME U-stamp and ABS Approval) design. The client wanted Stress simulation on the Separator as per ASME Code and Frame Stress simulation with In-place/ Operating condition – transit condition.