Project Info
Details Engineering Research and Development of 2 M.W. stream turbine with 8-pressure reduction stage
Client
Leading Manufacturer of Steam Turbine Unit
Project Duration
30 Week
Category
Oil and Gas
Location
Turkey
Description
Client:
A Europe-based client offering an array of customized solutions to power generation equipment along with performance guaranty.
Engineering Requirement:
Our client was seeking engineering design assistance for a 2.5MW steam turbine with 8 stage pressure reduction. The client wanted Stress simulation and Flow simulation for the whole system package