

Project Info
Detail Design calculation , FEA Stress Analysis and Detail fabrication Drawing for 30 TPH Hopper Structure for AFR.
Client
Leading Manufacturer of material handling equipment
Project Duration
2 Week
Category
Cement Industries
Location
India
Description
Client:
An India-based client offering an array of customized solutions to cement industries with customized material handling equipment.
Engineering Requirement:
Our client was seeking engineering design assistance for a 30 tph Hopper structure design. The client wanted Stress simulation on Hopper Structure with IS:875 wind applicable code and Seismic for manufacturing approval process.