Project Info
Dfm And Flow Optimization For 2.5 Mw Axial Steam Turbine 8 - Stage Pressure Reduction System
Client
Leading Manufacturer of Steam Turbine
Project Duration
12 Week
Category
Oil and Gas
Location
Turkey
Description
Client:
A Europe-based client offering an array of customized solutions to power generation equipment along with performance guaranty.
Engineering Requirement:
Our client was seeking engineering design assistance for a 2.5MW steam turbine with 8 stage pressure reduction. The client wanted Stress simulation and Flow simulation for the whole system package along with boiler to turbine piping header and Exhaust hood CFD validation.