

Project Info
DFM For Ropeway Crossing Bridge (80 meter length) of NH 206_NATIONAL HIGHWAY AUTHORITY OF INDIA APPROVED
Client
Leading Manufacturer of material handling equipment
Project Duration
12 Week
Category
Cement Industries
Location
India
Description
Client:
An India-based client offering an array of customized solutions to cement industries with customized material handling equipment.
Engineering Requirement:
Our client was seeking engineering design assistance for 80 Meter Bridge structure design. The client wanted a detailed calculation and Staad analysis report for the approval process.