Project Info
Detail Design calculation on, FEA Stress Analysis and Detail fabrication on Drawing for Surface condenser along with vacuum units
Client
Leading Manufacturer of Vacuum Skid package
Project Duration
24 Week
Category
Oil & Gas
Location
United Kingdom
Description
Client:
A Europe-based client offering an array of customized solutions to the chemical, pharmaceutical, petrochemical, oil refinery, power generation, and waste treatment.
Engineering Requirement:
Our client was seeking engineering design assistance for equipment’s (ASME U-stamp) design along with interconnecting piping routing. The client wanted Stress simulation on Equipment for the TUV Nord certification approval process along with piping stress analysis.