Project Info
CFD Simulation and Optimization from Boiler header pipe to Turbine Inlet section
Client
Leading Manufacturer of Boiler
Project Duration
2 Week
Category
Oil and Gas
Location
Turkey
Description
Client:
A Europe-based client offering an array of customized solutions to power generation equipment along with performance guaranty.
Engineering Requirement:
Our client was seeking engineering design assistance for a high-pressure flow distribution inside the turbine chamber from the boiler header pipe. The client wanted Flow simulation for the whole system package along with boiler to turbine piping header.