

Project Info
Detail Design calculation, FEA Thermal Stress Analysis and Detail fabrication drawing for Turbine - Condenser Duct
Client
Leading Manufacturer of Power Generation equipment
Project Duration
2 Week
Category
Oil and Gas (Power Generation)
Location
United State
Description
Client:
A US-based client offering an array of customized solutions to the chemical, pharmaceutical, Petrochemical, oil refinery, power generation, and waste treatment.
Engineering Requirement:
Our client was seeking engineering design assistance for a Condenser – Turbine Duct pipe Arrangements (ASME U-stamp) design. The client wanted a Thermal Stress simulation on the duct along with expansion bellow.